Engine stock
DP-E
Work completed:
-
Complete disassembly of the transmission.
-
Control of gears.
-
Replacement of bearings.
-
Metallisation of propeller shafts.
-
Replacement of the cone and control finger.
-
Replacement of all seals.
-
Hydraulic test.
-
Filling in oil.
-
Transition to the test bench.
-
Painting.
Available ratios:
-
1.78
-
1.95
Price includes:
-
Flange (supplied without helix).
Warranty conditions:
-
1 year warranty on replaced parts.
Rate:
-
Upon request.
Value | Unit | |
---|---|---|
Power |
0 0 |
kW ch |
Rate | 0 | rpm |
Number of cylinders | 0 | |
Bore | N/A | mm |
Stroke | N/A | mm |
Movement | N/A | litre |
Combustion | N/A | |
Compression | N/A | :1 |
Rotation | anticlockwise | Front view |
Width | N/A | mm |
Height | N/A | mm |
Depth | N/A | mm |
Weight | N/A | kg |
Baseframe / Inverter |
Z-Drive |
|
Year | 1997 | An |
Prix | 0 | € |